This project involved the upgrading of existing roads and the installation of new roads, stormwater lines and roundabouts (with live traffic). Over 70 000 cubic metres of earth was cut to fill. G T Civil installed a new sewer rising main, as well as coordinated the relocating of existing Telstra and gas lines. Erosion and sedimentation controls were put into place for the duration of the job.